Phénix (French for phoenix) was a small-scale (gross 264/net 233 MWe) prototype fast breeder reactor, located at the Marcoule nuclear site, near Orange, France. It was a pool-type liquid-metal fast breeder reactor cooled with liquid sodium. It generated 590 MW of thermal power, and had a breeding ratio of 1.16 (16% … See more Construction of Phénix began in November 1968. The first connection to the French national electricity grid was in December 1973. Plans for a French fast reactor date as far back as 1958's See more • Superphénix, the main reactor for which this was the demonstration See more • Summary of key parameters • Phénix FBR (drawing) See more WebMay 1, 2013 · Compared to the Phenix reactor, the choice of compact steam generators no longer enabled the evacuation on the secondary side only by opening the modular steam generator casing hatches. It was ...
The Superphénix Fast-Breeder Reactor - Stanford University
Web[en] The Phenix reactor holds a special place among French nuclear power plants. As a sodium-cooled fast neutron reactor it was quite unique. Built in 1968, by an integrated CEA/EDF/GAAA team, it would go critical in 1973 and be co-operated with EDF (80% CEA-20% EDF) from 1974 to 2009. WebMar 1, 2024 · The Phenix reactor consists of a primary circuit, three sodium secondary circuits, three water-steam tertiary circuits and a steam turbine. The primary system of … god of war setup download for pc
Phoenix™ Flow Reactor - ThalesNano
http://hyperphysics.phy-astr.gsu.edu/hbase/NucEne/fasbre.html WebThe French sodium-cooled, pool-type fast breeder reactor, PHENIX [1] was shutdown in 2009 after operating successfully for more than 35 years. This reactor had a design power of 563 MWt Web10 Phenix feedback experience . The Phénix sodium-cooled fast neutron reactor holds a special place among French nuclear power plants. . Built in 1968, by an integrated CEA/EDF/GAAA team, it went critical in 1973 and was co-operated with EDF (80% CEA / 20% EDF) from 1974 to 2009. . god of war setup installer