WebTest each lift to a minimum depth of 5.0 feet from the surface on sewer main and sewer service connections. Test each lift of fill on water main, water service ... Placing Trench Backfill and earthwork is subject to continuous inspection by WSSC. a. Allow time for WSSC to perform tests after completion of each layer of fill in WebM. Trench Conditions are defined with regard to the stability of trench bottom and trench walls of pipe embedment zone. Maintain trench conditions that provide for effective placement and compaction of embedment material directly on or against undisturbed soils or foundation backfill, except where structural trench support is necessary. 1.
How to Install Reinforced Concrete Pipe (RCP)
WebSpoil: Excavated material placed beside the trench. Backfill: Material used to refill trench. 7. Reference documents JSA Culvert Installation NE 109 ... pipes are lowered into the trench. Operator 1. Lift only loads that are within the rated capacity (mass of lifted load plus the lifting attachments at maximum lift point radius). WebJul 13, 2015 · The following frequenciesshall apply:Sand Bedding - Tests shall be made at a minimum of one test per lift per800 lineal feet of trench.TYPE II Backfill - Tests shall be made at a minimum of one test perlift per 500 lineal feet of trench.6.1.3 Tests will be reported by specific location: Example: T-pad 1: sandbedding test @ 3' from finish … chal jivi laie online
Effects of Lift Thickness, Backfill Material, and Compaction Energy …
WebTRENCHING & BACKFILL 02202-2 1.03 SUBMITTALS A. Certified test reports for the permeable material backfill tested in accordance with ASTM C 136. B. Samples: Submit 1 gallon size sample of permeable material for approval. C. Shoring and Sheeting Plan: Before starting work submit a CAL-OSHA permit for the shoring and sheeting plan when trench … WebMar 9, 2024 · Chapter 9 - Utilities Section 9D-1 - Utility Cut Restoration 3 Revised: 2013 Edition Figure 9D-1.02: Large Lift Thicknesses Used in Utility Cut Trench Backfill Material Placement Source: IHRB Project TR-566 2. Use of Appropriate Backfill Material: Class I and Class II backfill material, according to SUDAS Specifications Section 3010, should be … WebConstruction Standards Trench Backfill January 2024 CS TB 1 of 3 . SECTION 31 . TRENCH BACKFILL . 31-1 GENERAL - ... Material for mechanically compacted backfill shall be placed in horizontal lifts which, prior to compaction, shall not exceed the depths specified below for the type of equipment employed. chal jhutta